CAD Design Workflow: From 2D Drawings to 3D Models
A CAD design workflow is an organised set of steps taken to develop, coordinate, review, and issue design information from initial drawings through to more detailed digital models and documentation. 2D drawings and 3D models represent dimensions, geometry, construction components and spatial relationships along the way, and each supports a different part of the design process.
Consider a small commercial building. The project could start with current 2D information and move into 3D modelling and require coordination between architectural, structural, and building services teams. CAD workflows are often iterative since updates can go back and forth between drawings and models.
It should be noted, however, that the above process is not sequential because changes to design requirements may necessitate revisions of the drawings, models, and associated documents. This article outlines the digital design lifecycle from requirements to delivery.
What does a CAD Design Workflow Involve in Practice?
A CAD design workflow moves design information through requirements, drafting, modelling, coordination, revision and delivery, with outputs at each stage feeding the next. Autodesk’s guidance covers workflows starting from existing CAD drawings and taking them into Revit models.
The stages are rarely linear. Design development often involves repeated review, revision, and coordination as new information becomes available. It will not automatically update every related file, so someone has to check each affected document and revise it. These three points describe how CAD design workflow operates:
- The main stages of digital design development are: Requirements, drafting, modelling, coordination, revision and delivery.
- Design inputs, activities, and outputs: Inputs are the information that initiates a task, activities are the work done, and outputs are the deliverables produced.
- CAD workflows are generally iterative: A design change may require reverting to previous drawings, altering models or updating documentation.
Starting CAD Projects with Clear Design Requirements
Workflow issues usually result from unclear input. Before drafting a drawing or modelling, the team must first understand what needs to be achieved, what information is available, and what the outputs will be.
This step involves preparing the design information and is not related to software selection or whether the project is a 2D or 3D undertaking. It is worth referencing the information management principles within the UK BIM Framework. The table below indicates each design input and the purpose within the workflow:
| Design input | Purpose within the workflow |
|---|---|
| Project brief | Setting goals for the design and deliverables |
| Current drawings | Giving geometrical and dimension references |
| Site reports | Enabling positioning and space needs of the design |
| Design specifications | Specifying technical requirements |
| Drawing standards | Ensuring consistency of dimensions and annotation |
| Coordinate information | Assisting in coordination of information from various fields |
Developing 2D CAD Drawings from Initial Concepts
2D CAD drawings turn early design concepts into precise technical information. The CAD drafting process begins with geometric layouts and moves through dimensions, annotations and organised layers until others can use the drawing as a reference.
The architectural team develops a 2D floor plan showing the layout of rooms, locations of doors and major dimensions on the small commercial building. This gives a reference for a three-dimensional representation, but height, material, and component information still needs to be determined.
Geometric Layout Creation and Drawing Views Creation
Designers create drawings using the tools of line creation, shape creation and other drafting tools for representation of different building components in the form of plans, elevations, and sections. The plan shows horizontal geometry of the structure, whereas the elevations and sections show vertical geometry of the building.
Adding Dimensions, Layers, and Annotation
Dimensions show sizes and distances, whereas annotations provide the technical requirements of the building component. Layers separate the information of walls, doors, fixtures and other structural elements. Uniform drawing conventions assist others to understand the drawings without being confused about different components of the design.
Preparation of Drawings for Further Design Development
Before modelling the design, designers make sure that there is sufficient geometric information in the drawings. Plans may have wall positions and room dimensions, but ceiling height and material information can be missing, which needs to be determined at this stage.
How to Move from 2D Drawings to 3D Models?
Using the 2D drawings to construct 3D models, creating the necessary geometry and elements and aligning the outcome with current information. This is the core of a 2D to 3D CAD workflow.
Importing a 2D DWG into Revit does not create a magically intelligent 3D building model. The designer usually uses the drawing as an underlay or reference and builds the necessary model elements. Similarly, the original design source for producing the 2D documentation can also be a 3D model.
Want to learn how to turn 2D drawings into accurate 3D models? Ask our course advisors about CAD training using the chat icon below.
How CAD Software Supports Different Design Stages
Different digital desing and coordination tools support different stages of the workflow. For example, AutoCAD is mainly used for CAD drafting and documentation, Revit is a BIM authoring platform for coordinated model-based design, and Navisworks is primarily used for model aggregation, review, and coordination across disciplines involves in the project.
| Software | Typical contribution | Example output |
|---|---|---|
| AutoCAD | Technical drafting and geometric design. | DWG Drawings |
| Revit | Building modelling and associated documents | RVT Models, Drawing views, and schedules. |
| Navisworks | Model consolidation, review, and coordination | File coordination and review reports. |
Coordinating 3D Models Across Engineering Disciplines
Coordination aligns the architectural, structural, and building services models so teams can see how their work fits into the whole. A coordination model gives reviewers reference information to check work across disciplines.
The architectural team produces a 3D building model for the small commercial building; the structural and building services teams produce their own. A coordinated review has identified a ventilation duct that runs through a structural beam. This is not automatically corrected in the source model geometry in Navisworks and needs to be investigated and resolved by the responsible design teams. The three points below outline how to coordinate the 3D Models across disciplines that are involved in the project:
- Combined architectural and engineering models: Discipline models are viewed in combination. Multidisciplinary models should use an agreed coordinate system or shared coordinates so that each model aligns consistently in the correct project position when combined for review and coordination.
- Potential design conflicts: Reviewers will be looking for issues with structural elements, ducts, pipes and spatial constraints.
- Sharing design changes with the teams: Problems are passed to the relevant designers who update their own source data and re-issue.
Want to work confidently on multidisciplinary model coordination? Ask our course advisors how CAD training can help using the chat icon below.
Managing Revisions and Final CAD Design
Revision management ensures that everyone is working from the correct information. The CAD design workflow is moving toward delivery. Drawings and models are updated, reviewed and prepared for their intended use.
After coordination, the commercial building design team revises the affected model elements, updates the related drawing information, and generates deliverables for the next project stage. The UK BIM Framework provides relevant guidance regarding information management for projects in built-environment sector, including controlled information exchange, revision status, and collaborative working processes. Additionally, it should not be interpreted as guidance for every type of digital design workflow outside the built environment industry.
- Keep revision information clear so stakeholders are working from the correct versions by managing design changes and drawing revisions.
- Drawings and models for issue: Look at the drawing sheets, the file formats required, the supporting documents and the reason for the deliverables.
- Consistency of design information: A change to a model may require updates to related drawings, references or coordination information.
Delivering design and models is only part of the job, since drawings and models are usually issued to people who will build, price or coordinate from them. Mistakes in dimensions, references or revision information often show up late in the day and are costly when they do. Once you get into the delivery part of the workflow, knowing how the drawings and models are checked before they leave the design team would be essential.
Frequently Asked Questions
| Can I convert a 2D CAD drawing directly to a 3D model? Some software workflows can pull geometry out of 2D drawings, but generally, a full and accurate model will require additional information and modelling effort. Importing a DWG into Revit does not produce an intelligent building model, so designers typically use the drawing as a reference. |
| Do all CAD design workflows start with 2D drawings? Not really; some projects start with 3D and generate 2D drawings from the model, and some start from existing 2D drawings used as a reference. The starting point depends on the project, the information available and the deliverables. |
| Do CAD drawings and 3D models require different file formats? Yes, drawings often use DWG, while models may use RVT files, and IFC is an open file exchange format. The quality of information exchange will depend on the software and type of information that needs to be shared. |
| Is the same CAD workflow useful for both manufacturing and construction? To some extent, yes. Since both manufacturing and construction use a digital design workflow, but there are differences in the output, types of modelling used, technical specifications and the process after the creation, the workflow cannot be the same. |