What is BIM Management? A Complete Explanation
A construction project generates a lot of data from architects, engineers, contractors and other specialists. Drawings, computer models, specifications and technical documentation must remain coordinated as project needs evolve. Poor coordination can result in conflict between the various people involved in the project, as well as conflicting information.
Building Information Modelling (BIM) is much more than just the 3D models. It also requires structured processes for the production, review, sharing and maintenance of project information.
BIM management is the organisational framework for these activities. The article details its main functions, responsibilities, relationship with ISO 19650 and its practical use in construction project delivery and asset operation.
What is BIM in Construction?
BIM management is the process of organising and managing the people, information, responsibilities and collaborative arrangements associated with Building Information Modelling. This helps to ensure that project information is produced, coordinated, reviewed and shared in accordance with agreed requirements.
In construction, BIM management ties digital information to the processes used to make project decisions. This includes defining information responsibilities, setting delivery requirements, coordinating disciplines and ensuring information is fit for purpose.
BIM Management More Than 3D Modelling
BIM is more than simply building an accurate 3D model. Project teams also need to know where the information came from, whether it has been reviewed, which version is current and how it should be used.
For instance, although a structural model may contain correct beam sizes, it may still not be suitable for the construction if it has not been coordinated with information from building services. The UK BIM Framework supports this distinction by describing information management through agreed processes, responsibilities and standards across the asset lifecycle.
BIM Management: Core Functions
BIM management is a combination of related activities that provide reliable project information. These functions deal with planning, production, review, exchange and maintenance of information rather than the operation of a particular modelling application.
The table below shows the key functions and their purpose in delivering construction projects:
| Role of BIM Management | Main objectives |
|---|---|
| Information planning | Identify the type of information needed according to the time and reason. |
| Coordination management | Coordinate reviews with architectural, structural, and other disciplines. |
| Information quality | Assist in checking against agreed requirements and processes. |
| Exchange information | Establish controlled arrangements for sharing project info. |
| Taking on responsibility | Ensure responsibility for generating, checking, and approving information. |
| Proceeding information | Facilitate the transfer and continued use of project and asset information. |
BIM Management Jobs and Job Descriptions
BIM management responsibilities are not automatically vested in one person, but are distributed among project participants. Project information production and management can involve clients, designers, contractors, information management professionals and specialist coordinators.
The allocation of responsibilities should be consistent with the project’s appointments, information requirements and agreed working arrangements. Knowing these differences avoids gaps between information production, coordination and approval.
BIM Coordinator and BIM Managers
BIM managers usually take care of the information management arrangements, coordination requirements and the use of agreed procedures. BIM coordinators are often involved in multidisciplinary model reviews to identify coordination issues and communicate these to the appropriate design teams. However, the responsibilities can be shared or split between organisations in different ways.
Project Teams and Information Responsibilities
The appointed teams provide the relevant technical information. The information needs are set by the clients or other appointing parties. Designers still have to deliver on their technical deliverables, and information is still reviewed by designated reviewers or authorising parties as per agreed procedures.
Responsibilities should be explicitly assigned, not assumed from job titles. That is why ISO 19650 defines information management as a role, not a mandatory job title. The function may be assigned to suitably qualified persons or organisations according to project arrangements.
How does BIM Management Support Project Collaboration?
Project management through Building Information Modelling (BIM) makes collaboration on projects possible because it becomes a virtual space for all the parties involved in the project, such as the architect, engineers, contractors, and clients. The sharing of information between different technical disciplines in construction projects. Architectural, Structural and Mechanical, Electrical and Plumbing (MEP) teams may develop separate models, but their contributions must be coordinated to support reliable design and construction decisions.
BIM management defines the responsibilities, information exchanges and review arrangements required for this collaboration. It allows teams to discover the interfaces they care about, while still owning their own technical designs.
Multidisciplinary Information Coordination
Multidisciplinary coordination means looking at the interactions among information from different disciplines. Teams can review models together, look for potential conflicts, and identify decisions needed before information is used for subsequent project activities. The intent is to assist with coordinated decisions, not to move technical responsibility between disciplines.
Review of Model and Communication Management
Model reviews are used by project participants to identify and communicate problems affecting shared information. Agreed procedures describe how concerns are to be recorded, allocated and considered by the relevant parties.
BIM Management and ISO 19650 Standards
The ISO 19650 series gives a recognised framework for managing information through the whole life of built assets. It provides procedures for identifying information requirements, allocating responsibilities and organising the production, review and exchange of information.
In the UK, the UK BIM Framework sets out guidance on the use of these standards. ISO 19650 is not a requirement on all UK construction projects, but they do support consistent information management practices. Two important elements are the common data environment and planning information delivery.
Information Needs and Planning for Delivery
The information requirements specify what information is needed and why. A BIM Execution Plan (BEP) sets out information management arrangements and information delivery plans set out what appointed teams are required to produce, their responsibilities and the expected delivery timescales.
The Common Data Environment
A Common Data Environment (CDE) is the agreed process and supporting technology to manage project information. It handles sharing, revisions, status and access, enabling teams to find information that has been reviewed and authorised for its intended use.
These arrangements facilitate organised information management within the framework of project delivery and asset operation. But they only work when responsibilities are clearly defined and consistently applied, not just because electronic devices have been adopted.
BIM Management Across the Construction Lifecycle
BIM management allows the flow of project information from early design, through construction, and ultimately to asset operation. The information required at each stage depends on the decisions being made and the responsibilities of the parties involved.
That is why BIM management is more than the generation of design models. It also helps to define how information is updated, transferred and maintained during the project. The table below illustrates the value added by BIM management throughout the project lifecycle:
| Project phase | BIM management contribution |
|---|---|
| Design initiation | Coordination of information requirements, production of models and review of project arrangements. |
| Pre-construction | Support the readiness of information and multidisciplinary coordination. |
| Construction | Control the status of information exchanges, revisions and reviews. |
| Handover | Support the delivery of the agreed project plan and asset information. |
| Operation | Allow for maintenance and use of relevant asset information. |
Benefits and Limitations of BIM Management
The use of BIM management leads to effective project delivery since it enhances how information is organised, analysed, and shared among the different disciplines. Well-defined roles and responsibilities ensure that the technical information is coordinated, consistent, and decisions made are well informed.
Nevertheless, this does not rely only on the quality of the information and competencies. The inconsistency of the models, ambiguous roles, and incompatible systems may hinder the effective management of BIM. It is important for one to understand both the advantages and limitations of BIM management in order to set reasonable expectations when using it. These include:
- Clear responsibilities: Project teams know their information responsibilities.
- Better coordination: Teams have the knowledge to coordinate multidisciplinary information.
- Controlled dissemination of information: People are able to assess the status of information and revisions.
- Decision-making support: Information can be used by stakeholders for specific purposes.
- Information continuity: Linked information can support handovers and asset operations.
- Quality of information: Coordination may be difficult if information is incomplete.
- Technology and organisation limitations: Collaboration may be limited by incompatible software, lack of resources and unclear procedures.
Thus, successful implementation of BIM management relies on people, processes, information and technology rather than technology alone. Even with the existing procedures, coordination challenges may happen because of changes in project information and conflicting models created by other disciplines. Knowing how to diagnose and overcome the coordination challenges related to BIM becomes an important step forward.
Frequently Asked Questions
| Is BIM Management the same thing as building information modelling? Nope. Building Information Modelling is a broader approach to creating, managing and utilising digital information about constructed assets. BIM management is about organising the processes, responsibilities and coordination arrangements that support this approach. It helps to make sure that information is produced and disseminated to agreed requirements. |
| Is it necessary to code or programme for BIM Management? You don’t have to code all the time to manage BIM. Responsibilities are typically more geared towards information processes, coordination, project requirements and related digital resources. Some specialist positions may require programming or automation skills, but these are not essential for all BIM management professionals. |
| Is it viable to use BIM Management for small construction projects? Yes. The arrangements for managing BIM can be tailored to the size, complexity and information requirements of a project. Smaller projects may have less complex responsibilities, information exchanges and review procedures. The intention is to put proportionate arrangements in place rather than copy the information management structures used on large construction developments. |
| What is the difference between project management and BIM Management? BIM management is about information requirements, coordination, quality and controlled information exchange. Project management involves broader responsibilities like programme, budget, procurement, resources and delivery. The two functions are related, as good project decisions need reliable information, but they have different responsibilities and different goals. |