How to Resolve BIM Coordination Issues

How to Resolve BIM Coordination Issues

How to Resolve BIM Coordination Issues

Construction projects often involve separate digital models created by architectural, structural and mechanical, electrical and plumbing (MEP) teams. Even when teams use Building Information Modelling (BIM), problems can arise when models contain inconsistent coordinates, outdated information, or unresolved design conflicts.

BIM coordination issues may reduce the reliability of project information and create uncertainty about which technical details to apply. However, fixing the visible error does not always fix its root cause.

This guide explains how construction professionals can identify coordination problems, investigate their causes, select appropriate corrective actions and check that updated models are coordinated correctly.

Why do BIM Coordination Issues Arise?

BIM coordination problems are cases when information coming from different project disciplines cannot be combined, interpreted or reviewed consistently. These may be caused by technical modelling errors, incorrect information exchanges or undetermined design decisions.

A coordination problem does not mean that the original design is wrong. For instance, two models that are technically correct may seem to be in conflict because they are using different coordinate references. Therefore, before making any changes, it is necessary to identify the underlying cause. The usual causes are the following:

  • Inconsistent coordinates: Models have different reference points, orientations or positioning systems.
  • Outdated information: Teams see different versions of the same discipline model.
  • Inaccurate modelling: Elements or properties missing or improperly included in the model.
  • Interoperability problems: Information gets transformed or lost when applications exchange data.
  • Ambiguous responsibilities: Coordination difficulties continue because there is no appropriate reviewer assigned.
  • Uncommunicated modifications: Changes in design are not reflected in the models used by other roles.

BIM Coordination Problems and How to Solve Them

BIM coordination problems have to be addressed based on the symptoms and possible causes, not on assumptions. If a model seems out of place, it might not be aligned. Missing elements can be the result of incomplete exports or visibility settings that are not set correctly.

The following table lists common problems and some practical tips on where to begin troubleshooting. These activities should be adapted to the agreed information requirements and software environment of the project.

Coordination issue Potential cause Recommended solution
Unaligned models Different coordinate systems. Review shared coordination and model placement.
Apparent clashes Misaligned checking rules. Validate placement and review clash test settings.
Missing model elements Partial export or visibility settings. Check the source models, export settings, and filters.
Old model information Wrong revision selected. Confirm the updated revision required, status, and exchange.
Duplicate model entities Multiple imports or duplicate contributions. Review model references and responsible designers.
Unresolved design disputes Unclear responsibility for taking corrective action. Assign issues to the right authority.

A coordination issue is not considered closed until the cause of the problem has been corrected, and the corrected information has been reviewed. This prevents teams from mistaking temporary visual fixes for permanent fixes.

How to Identify the Source of BIM Coordination Issues

To find the origin of BIM coordination errors, it is necessary to find out whether the problem is in the original discipline model or in the exchange of information. The distinction keeps unnecessary design changes from happening when the real problem is model positioning, revisions, or exported information.

A practical investigation should start with the information that has been affected and progressively isolate the source. The following checks help to identify which team or process requires corrective action.

Verify Each Model’s Revision and Source

Each discipline model must be sourced from the agreed information source and have the correct revision and status. Compare file references, issue dates and change records to determine whether superseded information has entered the coordination environment.

Verify Model Coordinates & Exchange Settings

Check the coordinate reference, the model origin, orientation and units as agreed. Check the relevant export settings to see if there has been a change in position or geometry during the information exchange. Compare the model that you exchanged with the source and then correct it.

Review Design Conflicts and Modelling Errors

A modelling error is defined as digital information that does not accurately reflect the design it is intended to represent. When the properly represented elements conflict with each other, it is a design conflict. The former requires information to be corrected; the latter usually requires a technical review and an authorised decision.

Resolving Model Alignment and Compatibility Issues

BIM model alignment problems arise where discipline models are based on inconsistent coordinates, reference points, orientation or units. The mismatches can lead to misplacement of elements even if the geometry of the elements is correct. To fix them, you need to check the agreed project references and not only change their look in a coordination viewer.

Different BIM applications have information exchange problems to be compatible. Export settings, IFC versions or how the software interprets them can affect geometry and data properties. A table of common problems and corrective actions is given below.

Issue Way to resolve the issue
Inconsistent coordination Ensure that project coordinates are properly aligned and fix the source or export settings.
Incorrect model positioning Check model sources, reference points, and orientation before re-exporting.
Different measurement units Ensure proper units and fix any scaling problems resulting from export.
Missing or distorted geometry Compare the exported model to the source and check export settings.
IFC version incompatibility Ensure support for proper IFC versions and export needs of receiving applications.
Missing data properties Check property mappings and export settings to ensure proper information is preserved.
Incorrect model interpretation Compare source and imported information to see differences between application handling of exported data.

Managing BIM Clashes Between Project Disciplines

BIM clash detection issues arise when coordination reviews show possible clashes between architectural, structural, or MEP information. These can be physical intersections, lack of clearance in operation or apparent conflicts due to incorrect positioning of models.

Clash detection highlights conditions for investigation. Not all flagged clashes are real design issues. Teams need to look at the results, determine their significance and decide which discipline will own taking the necessary action.

Separating Genuine Clashes from False Positives

Check tolerances and design intent. Review reported clashes against agreed model alignment. Some alerts are generated by overlapping representations or incorrect settings. Once these technical issues are resolved, there are still real conflicts that need to be addressed properly in the design.

Designate responsibility for resolving clashes

Route confirmed conflicts directly to the discipline responsible for the impacted design information. In case of multiple disciplines involved, identify who must review the interface and who can approve the proposed resolution. • Capture required action and decision status.

Confirming the Updated Models

When the responsible team updates its information, get the new model and go through the appropriate coordination checks again. Confirm that the original conflict has been resolved, that no new issues have arisen and note any outstanding issues that require further review.

Additionally, the table below distinguishes common clash types, and the appropriate responses should be taken for the issues:

Clash type Example Appropriate response
Hard clash A ventilation duct runs through a structural beam. Review design alternatives with the disciplines responsible for the issues.
Clearance issue Equipment lacks sufficient maintenance access. Review clearance requirements and change layout.
Apparent clash 2 models have inconsistent placement. First, get the alignment right, then proceed with the design changes.

Fixing Information Sharing and Version-Control Problems

Even if individual models are technically correct, BIM coordination issues may still occur. This can occur when teams are working off outdated revisions, receive information with an incorrect status or do not communicate changes that impact other disciplines.

UK BIM Framework provides guiding information management principles associated with ISO 19650. This includes controlled information sharing, responsibilities and review arrangements which help teams to identify information appropriate to a particular purpose.

The following corrective actions are required for common information sharing problems:

  • Superseded revisions: Confirm the current authorised information and remove obsolete references from active coordination.
  • Unreviewed information: Before using a model for its intended purpose, confirm the review status.
  • Changes not communicated: Inform affected disciplines, identify shared information to be updated.
  • Unassigned issues: Determine who needs to review, respond to and close each documented coordination issue.
  • Inconsistent file references: Reconcile model identifiers, revisions and information sources with agreed records.

The solution to version-control issues is to re-establish a trusted source of data, not to propagate yet another model. Before teams coordinate, they should ensure that affected participants have been provided with appropriate information and understand the status.

Resolving BIM Coordination Issues and Preventing Recurrence

Solutions to BIM coordination challenges go beyond just fixing any errors that can be seen in the model. In addition to that, the construction crew needs to understand the reason behind such an issue, use the right approach in solving the problem and ensure that the information provided after fixing the error is trustworthy. The steps below can be adopted to solve BIM coordination problems and minimise their recurrence:

  • Root cause analysis: Establish whether the cause is due to model geometry, alignment, data transfer or an unsolved design conflict.
  • Corrective actions: Fix inaccurate information, fix exchange settings, or escalate the design conflict to the relevant disciplines.
  • Model checks: Confirm that the original problem has been fixed by rechecking the model.
  • Information consistency: Consistently use agreed model references, revisions, and exchange specifications between disciplines.
  • Coordination process improvement: Analyse recurring problems and weaknesses in the coordination process.

In conclusion, successful BIM coordination calls for technical expertise, credible information and competent judgement. Although the use of corrective procedures helps to solve the challenge that arises at the moment, it calls for the right expertise to be used in doing this all the time. Finding ways to resolve BIM coordination issues leads to one consideration for professionals in related areas: whether a structured programme can be beneficial for them to expand their competencies in BIM coordination.

Frequently Asked Questions

What is the most common problem with BIM coordination?

The most common BIM coordination problem is not universally established. Typical issues include uncoordinated model placement, outdated revisions, missing parts and unresolved design clashes. Their quantity varies from project to project depending on the quality of the information, the technical complexity and the arrangements used for model exchange and review.

How to decrease recurring coordination errors among BIM coordination teams?

With the creation of consistent exchange criteria, verification of model coordinates, controlled modifications, and accountability for correction, the same mistakes do not need to be made repeatedly. It is important to check the information after it is corrected because solving the visible problem does not necessarily solve the underlying problem.

Can BIM clashes be automatically resolved?

BIM software can detect potential clashes, manage findings and help with automated checking. In most cases, however, resolving substantive design conflicts will require the professional judgement and decisions of the responsible disciplines. Automated detection cannot independently verify whether a suggested change meets structural, operational or other project requirements.

Who is responsible for solving BIM coordination problems?

The responsibility will depend upon the nature of the issue and the established information management protocols of the project. The BIM coordinators will be able to identify the problem and the designer will be able to resolve the issue of his technical information. There might be some issues which require further clearance due to their multidisciplinary nature.